Scheduling
Hi,
I have 4 workbooks and I want them to run in a sequential manner i.e. if workbook 1 is successful then 2 should start running. Is there any way to setup scheduling job in datameer.
-
Hi Aditya,
You're looking for Data Driven triggering.
Please see our documentation here: Configuring Workbook Settings - Advanced Scheduling, Data Driven Options
Alan
Please sign in to leave a comment.
Comments
1 comment